Commit Graph

6 Commits

Author SHA1 Message Date
Wolfgang Helbig 630d15bbf9 Handle option -j correctly.
Synchronize usage message with man page.
PR:	bin/5488
1998-01-15 10:23:34 +00:00
Philippe Charnier a99e456443 Sync usage and synopsis. Add rcsid. 1998-01-07 07:46:33 +00:00
Wolfgang Helbig f8a0edba2c 1. Don't be confused if the first day of a month is dropped due to
Gregorian Reformation. E. G. in Albania December 1, 1912 doesn't exist.
2. Add some countries in the switch table (BE, FI, LN, LU)
3. Correct some entries from the new found source of calendar knowledge:
   http://www.pip.dknet.dk/~c-t/calendar.html,
   That is Claus Tondering's Calendar FAQ.
1998-01-06 00:46:11 +00:00
Wolfgang Helbig cde26ed2a0 Use locale to guess the switch date.
Localize formatting of date of easter.
Suggested by:	ache
1998-01-03 15:10:11 +00:00
Wolfgang Helbig a4264dce8c Ensure 2 letter abbreviations of weekdays (even if LANG=C
and invoked as "cal").
1997-12-31 15:55:08 +00:00
Wolfgang Helbig 0cb2e609d9 Add new command ncal. 1997-12-15 20:35:22 +00:00